TNH Datacenter Facility
The information in this article applies to:
Facility
- Concrete Tilt-Up Construction
- Raised floor
- Building Management / Alarm Monitoring System
- Power and data cables are run perpendicular from each other to
minimize any electrical field interaction
- Janitorial service is bonded, insured and licensed
Security
- 7/16 inch thick steel sheeting around the front door and within
the front reception area
- 2 level, man-trap, security access – before actually being able
to enter the raised floor area
- Multiple fixed positioned, security cameras
- All camera footage is recorded and held for a minimum of 30 days
- Level 5 bullet-resistant walls / glass (Kevlar Lined walls) in
the front entry, lobby, guard station, and shipping and receiving
areas
- 24 x 7 x 365 on-site security guards
- Security service is bonded
Air conditioning
- Data Center temperature maintained at 72 degrees +/- 2 degrees
- Thermostats / Humidistats are located around the building on the
walls, posts and ceilings
- Air conditioners running continuously w/redundant capacity
- Air handlers are located on the roof (roof access is restricted
and monitored)
- Supply air temperature entering the IDC averages 55 – 62%
varying with load conditions
- Ring duct in ceiling allows us to add diffusers (vents) where
needed to provide additional air flow
- Two 125 Ton A/C Units, and one 70 Ton unit is dedicated to UPS
Room
Power
- Main electrical distribution buses
- MGE UPS's
- Caterpillar 2000KW (2.0MW) generators
- Each generator has 3,000 gals of diesel fuel – enough to power
it for 22 hours at full load
- 4 – 12,000 gal. Diesel Fuel storage convault tanks (in addition
to the primary fuel tanks) provide enough fuel to run generators
continuously for 72 hours at full load
- UPS batteries support data center load until automatic transfer
to generator is completed
- 50 power management modules (PMM's) with 168 – 20 amp power
circuits from each 165KVA power distribution unit (PDU); customized
circuits provided as needed
- Power is served to the PDUs via 2 separate independent UPS power
sources
- Each PDU has it's own Automatic Static Transfer Switch which can
switch the power to the alternate source within 4 milliseconds
- Contracts with local fuel companies to provide additional
on-site fuel, once generators are started
Fire suppression
- VESDA – Very Early Smoke Detection and Alarm system; small white
'air sampling tubes' draw air into chambers, where lasers analyze
the air for smoke content
- Clean-Gas hand-held fire extinguishers are through-out the
building
- Heat (140 degree) and smoke detectors are located on the
ceilings around the building
Network/bandwidth
- Redundant OC48s
- Cconduits for telco fiber leading to the street
- Multiple redundant network paths
- All network operators certified internet systems engineers